What does the rough house mean? What are the specifications for rough room decoration?

The rough house is also called the “first-decorated house”. In most houses, as long as the door frame has no door, the wall surface is only treated as a foundation without surface treatment. All exterior finishes, including balconies and rain covers, should be finished in accordance with the planning documents. As we all know, rough room decoration is a very troublesome thing, then what are the specifications for rough room decoration? Next, follow the decoration home network Xiaobian to learn about the related content of the rough room decoration!


毛坯房装修


What does the rough house mean?


The rough house is a new concept of modern domestic commercial housing. It mainly refers to the construction of the interior without any decoration. The wall, the ground and the top do not have any surface layer. There is no door leaf in the room, as long as the door frame, there is no equipment in the bathroom. As long as the water supply and drainage Interface, as long as the low-grade washing basin and the faucet in the kitchen, any indoor lighting, as long as the wire interface, and even some partition walls in the room, there is no such a convenient decoration for the owner.


1. People with strong economic strength have high requirements for living conditions and environment, and have more spare time to follow up the decoration;


2, the income of the general working class, subject to economic strength, the decoration of the fine decoration room is higher than its program, buying a hardcover house is equal to increasing the economic burden;


3, concentrate on people who want to decorate their home.


What are the specifications for rough houses?


1. All the exterior finishes of the rough house, including the balcony and the outer cover of the rain cover, should be completed according to the planning documents.


2. If the prefabricated floor slab or the cast-in-place slab is used in each room, it should be made without plastering and leveling with putty. The board will be dense and crack-free, and the slab will be smooth and seamless. The surface is flat and the color is even and uniform. The line angle is straight.


3. Various pipelines in the rough room should be tested for water, pressure test, ball passing test and heating and thermal commissioning.


4, the rough room delivery standard The room with waterproof request should be strictly in accordance with the construction requirements of the waterproof layer and the protective layer. Two water storage experiments should be carried out during the inspection to avoid leakage.


5, the elevation of the bottom layer of the cement floor in various rooms, should consider the request for height scale when re-decoration.


毛坯房装修


After the renovation of the rough room, the standard of delivery:


1. All exterior finishes, including balconies and rain cover exterior finishes, should be completed in accordance with the design documents.


2. Common parts, public facilities, various pipes (give, discharge, rain, warm, heat), electrical equipment (distribution boxes, cabinets, plates, sockets, switches, lamps, etc.) should be completed according to the design documents. And complete various test projects as required.


3. All kinds of pipelines should be inspected and accepted by water, pressure test, ball test and heating and thermal commissioning.


4. The roofing project carries out water storage and watering tests.


5. If the pre-fabricated slabs or cast-in-place slabs are used in each room, the slab should be plastered and leveled with putty to achieve a dense and crack-free seam, smooth and unobstructed, smooth surface and uniform color. The line angle is straight; the concrete on the ground floor of each room should be flat and compact, so as to achieve firm bonding and no cracks.


6. When the rough room is renovated, the floor of the room with waterproof requirements shall be planned in strict accordance with the construction requirements of the waterproof layer and the protective layer. During the acceptance, two water storage tests shall be carried out to achieve no leakage.


7. The floor drain and flooding slope meet the design requirements, and the flooding is not reversed. The joint is tight and smooth, and there is no leakage.


8, the elevation of the cement floor base of various rooms, should consider the height dimension requirements when re-decoration.


The above is a detailed answer to the renovation of the rough house. I don't know if you are satisfied with the introduction of the decoration home network. If you want to know more about the exciting content, please continue to pay attention to our decoration encyclopedia!



More related wonderful reading:

How to decorate the rough room? Rough house renovation process

How to decorate the rough room? Detailed description of the renovation steps of the rough house

What are the steps for the renovation of the rough room? What are the precautions?

What are the steps and costs of rough room decoration?

What are the steps for the renovation of the rough room? Analysis of the renovation steps of the rough house

The biggest selling point of LCD monitors is their ever-improving response times, from the initial 25ms to the current 4ms grey scale. The response time determines the number of frames a Monitor can display per second. Typically, when the screen is displayed at more than 25 frames per second, the human eye sees the rapidly changing images as continuous.

According to the size of points


LCD monitors are divided into: 3.5 -inch LCD Monitor / 5.6 -inch LCD monitor / 8 inch LCD monitor / 10.4 inch LCD monitor / 12 inch LCD monitor / 15 inch LCD monitor / 17-inch LCD monitor / 19 inch LCD monitor / 20 inch LCD monitor / 22 inch LCD monitor / 24 inch LCD monitor / 26 inch LCD monitor / 32 inch LCD monitor / 37 inch LCD monitor / 40 inch LCD monitor / 42 inch LCD monitor / 46 inch LCD monitor / 47 inch LCD monitor / 52 inch LCD monitor / 55 inch LCD monitor / 65 inch LCD monitor / 70 inch LCD monitor /82 inch LCD monitor, etc. /84 inch LCD monitor /84 inch LCD monitor, 110 inch LCD monitor.


According to the color points


Color, black and white monitor. CRT monitors are classified by scanning mode: interlaced, progressive scanning, etc., while LCD monitors are not distinguished by scanning mode.

10.4 inch Open Frame Monitor

Frame Monitor,Open Frame Touch Screen,Open Frame Display,Open Frame Touch Monitor

Tonya Display Limited , https://www.tydisplay.com