Home improvement hardware installation steps

If you're not using these hardware components, it's still important to be optimistic about the installation process. Don't take it lightly—each small part is carefully matched with furniture and requires precise installation steps. Although this guide may not cover everything, we hope Star Hardware’s website can provide you with useful support along the way.

1. Paint Coating

When installing woodworking hardware, paint is often a key consideration. The timing of hardware installation must align with the painter's work. This involves two main points: First, don’t install hardware too early, as painters will have to protect it during their work, which can complicate their process. Second, be careful not to damage any painted surfaces or finished work when installing hardware. Typically, drilling for hardware like handles or locks is done before the painter finishes their job, or before major construction steps. For example, drilling holes for door locks or handle fixtures should be completed at this stage. Once the painter has finished their work, the woodworker can proceed with the installation.

2. Installation of Electrical Fixtures and Switch Sockets

Electrical fixtures and switch socket panels should be installed after the walls have been painted or wallpapered. There have been cases where electricians installed sockets too early, leading to damage. One company, for instance, had an electrician accidentally cut through a switch panel while using a wallpaper knife to make an opening. This shows how important it is to coordinate with other trades and ensure the right timing for each step.

3. Sanitary Ware and Bathroom Hardware Installation

Due to the current low level of management in the home improvement industry, many on-site workers lack proper training. As a result, there have been numerous incidents where construction workers used newly installed bathtubs before they were ready. In recent years, this has led to many complaints from homeowners. To avoid such issues, it's best to delay the installation of sanitary fixtures until most of the construction team has left the site. Otherwise, you might find hair or debris in your new bathtub.

Global hardware network

Concerned about surprises

Tag: Hardware, Home improvement, Installation time, Installation work, Switch socket

Previous: Three high-quality hardware locks to buy next one Next: Common hardware accessories four materials

Diaphragm Valve

Diaphragm Valve,Sanitary Diaphragm Valve,High Purity Diaphragm Valve,Stainless Steel Diaphragm Valve

WENZHOU FOREVER CLASSIC TECHNOLOGY CO.,LTD , https://www.fosicvalve.com