The most powerful strategy for renovation of hydropower

Hydropower transformation

Ready to work:

1. Complete the decoration procedures at the property office (that is, before the decoration, be sure to choose a decoration company, not to be careless)

2. Require the property to coordinate the upstairs residents who have not been renovated, and do the water-free experiment on the upper floor (to prevent the water seepage upstairs, the crisis downstairs, and find problems early maintenance)

3, you must first have your own or your own designer to put the kitchen and bathroom in the layout, brand, location has a design overall program.

4, set the cabinet, on the day of construction, about the cabinet master or let the designer position the basin and the required outlet.

5, decide whether to use electric water heaters or burners to burn hot water, the advantages and disadvantages of the two sides by the owners themselves to make a good choice. Electric water heaters need to be branded and sized.

6, the height of the shower is determined. The pedestal needs to be sized and the owner of the bathtub or the overall bath room needs to be set and sized before the water is changed. It is best to recommend that you have one or two outlets.

The main reason for changing the water: clearing the tube and concealing the tube, creating a personalized water environment according to the population and water habits of each family.

The problem of changing the water attention: the left hot right cold should be clearly separated, the construction should be pressed after the test, and the quality assurance card needs to be signed, and the waterway transformation drawings should be issued.

Need to be reminded that some communities are thicker and thicker than the load-bearing wall, can not cut the steel bars (affecting the quality of the house), can only open shallow (requires thickening of cement when tiling) or walk the pipe, or bypass other Wall, if the owner wants to brush the water in the groove, it needs to be explained in advance when making an appointment. In fact, our operation specifications, there will be no joints in the groove, that is, there will be no leakage. Probability, but the brush is not brushed waterproof or the owner chooses.

If the owner changes water, he may consider adding something later and need water. Then we will reserve one or two outlets according to your requirements. When you need it, install the faucet.

Remember to plan the overall layout before starting construction, so as to avoid mistakes when communicating with construction personnel. Our construction is generally carried out according to the routine, so there are special requirements that need to be clearly explained to the construction personnel in advance.

Change the power part:

Need to pay attention to the project of changing electricity: master bedroom:

1. Main light (can consider bedside dual control),

2. Cable TV (suitable location, equipped with socket),

3. Internet telephony (usually placed on the bedside table with socket),

4. Add one socket to the back of the two bedside cabinets (for more humanization, you can add a socket above the bedside table, so that it will not be blocked, it is more convenient to use, and the bedside is more suitable for using the groundless socket)

5. Is the air conditioner socket in the right position?

6. There can be lights in places with aisles.

7. A large wardrobe with poor lighting can be lit.

8. Two motorized sockets, placed on open unobstructed walls for occasional use of electrical appliances such as vacuum cleaners and electric irons.