Full scaffolding how to build

Full scaffolding how to build

Scaffolding is the most widely used and professional equipment on the construction site. Therefore, it must be checked before use. This is a guarantee for user safety.

Order phone

Luzhou Gongde Foundry Co., Ltd. specializes in the production of scaffolds and scaffolding accessories. Ganzhou Gongde Foundry Co., Ltd. looks forward to your visit.

A vertical scissor is placed around the center of the scaffolding and every four spans in the middle. Each pole is increased by 2m to increase the level of support. Each level of the scaffold is placed with a horizontal scissor; the full scaffolding should be made of steel pipe or gantry and supported by the load. The structure and structural design of the height and area of ​​use are used to prepare a special construction plan, which is strictly implemented according to the plan.

The full-scale scaffolding shall have a vertical distance of not more than 2m. The bottom of the pole shall be placed with wood-type panels and bases. The adherence-type lifting scaffold shall not be allowed to use bricks and brittle materials; the distance between the frame and the edge of the wall or other structures shall be less than 0.5m. Should be placed around the railings. When the full scaffold is placed in the middle of the channel, the horizontal gantry may not be provided on the bottom gantry of the channel; however, the horizontal reinforcement bar should be placed at each step of the upper channel, and diagonal reinforcement bars should be provided on both sides of the channel gantry.

The erection of scaffoldings can be constructed row-by-row, row-by-row and layer-by-layer, and should be constructed with the safety protection provided by the construction of scissor supports, horizontal reinforcing rods, throwing supports, cable wind ropes, and channel boards. When the erection height exceeds 10m, the lock arm shall be placed between the upper and lower doorframes, and the outer side shall be put on the brace or the cable wind rope shall be firmly tied with the ground.

When scaffolding is being erected or demolished, operators should lay special scaffold boards to fasten the seat belts to ensure safe operation.

Types : Weld neck Flanges (WNRF), Slip-on Flanges (SORF), Blind Flanges (BLRF), Lap Joint Flanges (SOLJ), Socket-weld Flanges (SWRF), Screwed (Threaded) Flanges, Long weld neck Flanges (LWNRF), Spectacle Blind Flanges Spacer & Blind Flanges, Ring Type Joint Flanges (RTJ), Reducing Flanges, Raised Face (RF) Flanges, Orifice Flanges, Large Diameter Flanges, Custom Flanges, Drawing Flanges, Forged Flanges, Plate Flanges, Flat Face Flanges, ANSI Flanges, ASME Flanges, BS Flanges, DIN Flanges, API, EN Flanges etc.

ANSI/ASME B16.5, B 16.47 SS Flanges, Stainless Steel 304, 316, 316L Slip On Flanges, Stainless Steel 310, 310S, 446 Blind Flanges, SS Forged Flanges, Steel Orifice Flanges, SS Reducing Flanges  

Stainless Steel Flanges Specification:
Grade :SS 304, 304L, 304H, 316, 316L, 316LN, 316Ti, 309, 310S, 317L, 321, 347, 409, 410, 420, 430, 446, 202 Etc.
Standard : ASTM A182 / A240 & ASME SA182 / SA240
Size : ½" to 48″
Dimensions : ANSI/ASME B16.5, B 16.47 Series A & B, B16.48, BS4504, BS 10, EN-1092, DIN, JIS-K, etc.
Class / Pressure: 150#, 300#, 600#, 900#, 1500#, 2500#. PN6, PN10, PN16, PN25, PN40, PN64 etc.

Stainless Steel Flange

Stainless Steel Flange,Stainless Flange ,Stainless Steel Pipe Flange,Steel Pipe Flange

Zhejiang Max Stainless Steel Co.,Ltd , https://www.cnstainlesstube.com